Patricks Terminal Brisbane
[CATCH PHRASE GOES HERE]
Description: The detailing challenges in this project included dealing with several different use buildings that each required a unique detailing approach. For example, the maintenance building has overhead cranes, access platforms, ladders, and girts inside and outside with bracing in between. The control tower was fully assembled on the ground in four pieces and lifted into position on the 30m high concrete tower.